Check out some pictures of the Centerhouse all lit up at night. We also conducted a speaker test to see what the acoustic are like. The building is really coming together now, only a few more weeks and it should be all finished!
Check out the new kitchen in the Firwood Centerhouse. Also pictures of the bathrooms and the wainscoting going up around the perimeter. A big thanks to Doug Walker and Bob Lee for all their hard work in installing the wainscoting. Thanks guys!
Time lapse of the crew pouring 35 cubic yards of concrete floor in the main part of the Centerhouse. This week, they are continuing with making expansion cuts and sealing the floor. The crew is also hard at work hanging cabinets and installing kitchen equipment. As we near completion, continue to keep the Centerhouse in your prayers.
Check out the inside of the Centerhouse in this 360 virtual tour. This shows the interior paint, the finished fireplace as well as the garage doors installed.
Over the past weeks, the interior of the Centerhouse has been painted. Along with the new coat of paint, the 5 garage doors around the perimeter of the building are being installed. The kitchen is another area of activity. The crew has laid the tile in the kitchen and dish room as well as installed the new walk-in fridge and freezer. Check out the rest of the progress in this photo gallery below.
Around the exterior of the building, the crew has been pouring concrete slabs in front of doors as well as sidewalks. The concrete floor for the dining room portion of the building is scheduled to be poured this upcoming Friday. After that, the crew will start installing the kitchen equipment.
The kitchen, bathroom and storage room concrete floors were poured today. Also, the outside of the building is coming along with doors and siding going up.