Progress Update #14

Wednesday, September 30th, 2009

Check out this time lapse of the crew setting the trusses on the Centerhouse.

Tags: , ,
Posted in Update

Progress Update #13

Saturday, September 26th, 2009

A short video showing the trusses installed on the Centerhouse. The crew will be start installing the SIP panels on Monday and should be done by the end of the week.

Tags: , ,
Posted in Update

360 Virtual Centerhouse Tour #2

Saturday, September 26th, 2009

A 360 tour of the Centerhouse with all the trusses in place. Check it out below.

Download Adobe Flash Player 10 here to view.

The Flash plugin is required to view this object.

Tags:
Posted in Update

Setting Trusses

Thursday, September 24th, 2009

There was lots of action on the construction site today. The morning was spent unloading and assembling the trusses for the roof. The afternoon brought the installation of 3 of the 6 trusses that are needed for the building. Check out the progress in the photo gallery below:


Lifting a Truss into Place

Tags: , , ,
Posted in Update

360 Virtual Centerhouse Tour #1

Monday, September 14th, 2009

Check out this 360 degree virtual tour of the Centerhouse. This picture was taken around the middle of the building. Click and hold your mouse to scroll left or right.

If it doesn’t show up, download Adobe Flash Player 10 here to view.

360 Virtual Tour

The Flash plugin is required to view this object.

Tags: , , ,
Posted in Update

Framing Update

Monday, September 14th, 2009

Check out these pictures of the framing progress on the Centerhouse. The crew has been working hard at the side walls as well as the front wall. This past week has brought the arrival of the SIP panels [which stands for Structural Insulated Panels] to the Fill Site. The 4′ x 20′ panels will make up the roof structure of the building. This upcoming week, the crew will be bringing in the exterior posts for the building. The arrival of these posts will start the deck construction. The posts will also provide support for the trusses which are scheduled to arrive Monday the 21st.

Photo Gallery

Tags: , , ,
Posted in Update

Progress Update #12

Wednesday, September 9th, 2009

A short video showing the progress of the past week or so. The crew has been working on building exterior walls and setting posts for the roof. Take a look here:

Photo Gallery – Progress Update #12

Exterior Walls Go Up

Exterior Walls Go Up

Tags: , , ,
Posted in Update

Progress Update #11

Tuesday, September 8th, 2009

This time lapse shows the process of setting the support beams through finishing the sub floor.