Progress Update #18

December 1st, 2009

The crew has been hard at work finishing up the electrical, plumbing, heating and sprinkler systems. The insulation is starting to go up as well as a few of the doors. This Friday, the plan is to pour the concrete floor in the kitchen.

Tags: , , , ,
Posted in Update

Inside the Centerhouse #2

November 30th, 2009

The crew has started insulating the walls as well as preparing the outside of the building for stucco. Check out the gas fireplace installed as well as some view inside the walls of the Centerhouse.

Tags: , , ,
Posted in Update

Inside the Centerhouse #1

November 9th, 2009

Check out these pictures of the inside of the Centerhouse. The crew has installed the kitchen hood and all the interior walls have been framed.

Tags: , , , ,
Posted in Update

Progress Update #17

October 29th, 2009

With the roof now installed, the crew has been busy the last few weeks framing the interior walls of the building. The numerous subcontractors on the project have also recently started installing the electrical system, the sprinkler system, metal on the roof and the heating and cooling ductwork.

Tags: , , , ,
Posted in Update

Progress Update #16

October 23rd, 2009

In case you missed any of the last 5 months, here is what has happened on the Centerhouse project. This video shows selections of time lapses to show the progress so far.

Tags: , , , ,
Posted in Update

Progress Update #15

October 5th, 2009

One of the most interesting updates so far. This video shows the installation of the SIP panels for the Centerhouse. This was recorded over the past week.

Tags: , , ,
Posted in Update

Progress Update #14

September 30th, 2009

Check out this time lapse of the crew setting the trusses on the Centerhouse.

Tags: , ,
Posted in Update

Progress Update #13

September 26th, 2009

A short video showing the trusses installed on the Centerhouse. The crew will be start installing the SIP panels on Monday and should be done by the end of the week.

Tags: , ,
Posted in Update

360 Virtual Centerhouse Tour #2

September 26th, 2009

A 360 tour of the Centerhouse with all the trusses in place. Check it out below.

Download Adobe Flash Player 10 here to view.

The Flash plugin is required to view this object.

Tags:
Posted in Update

Setting Trusses

September 24th, 2009

There was lots of action on the construction site today. The morning was spent unloading and assembling the trusses for the roof. The afternoon brought the installation of 3 of the 6 trusses that are needed for the building. Check out the progress in the photo gallery below:


Lifting a Truss into Place

Tags: , , ,