Recent Posts

360 Virtual Centerhouse Tour #3

January 27th, 2010

Check out the inside of the Centerhouse in this 360 virtual tour. This shows the interior paint, the finished fireplace as well as the garage doors installed.

Download Adobe Flash Player 10 here to view.

Download Adobe Flash Player 10 to view.

Tags: , ,
Posted in Update

Progress Update #21

January 21st, 2010

Over the past weeks, the interior of the Centerhouse has been painted. Along with the new coat of paint, the 5 garage doors around the perimeter of the building are being installed. The kitchen is another area of activity. The crew has laid the tile in the kitchen and dish room as well as installed the new walk-in fridge and freezer. Check out the rest of the progress in this photo gallery below.

Around the exterior of the building, the crew has been pouring concrete slabs in front of doors as well as sidewalks. The concrete floor for the dining room portion of the building is scheduled to be poured this upcoming Friday. After that, the crew will start installing the kitchen equipment.

Tags: , , ,
Posted in Update

Progress Update #20

January 7th, 2010

Check out this latest video of the progress on the Centerhouse. The crew is finishing the drywall, working on the decking and painting the downstairs.

Tags: , , ,
Posted in Update

Aerial Photo

December 28th, 2009

Riley Mullet, a Firwood Summer Staff alumni, snapped this shot as he flew over the Centerhouse. Thanks Riley for the great pic!

Tags: ,
Posted in Update

Progress Update #19

December 4th, 2009

The kitchen, bathroom and storage room concrete floors were poured today. Also, the outside of the building is coming along with doors and siding going up.

Tags: , , , ,
Posted in Update

Progress Update #18

December 1st, 2009

The crew has been hard at work finishing up the electrical, plumbing, heating and sprinkler systems. The insulation is starting to go up as well as a few of the doors. This Friday, the plan is to pour the concrete floor in the kitchen.

Tags: , , , ,
Posted in Update

Inside the Centerhouse #2

November 30th, 2009

The crew has started insulating the walls as well as preparing the outside of the building for stucco. Check out the gas fireplace installed as well as some view inside the walls of the Centerhouse.

Tags: , , ,
Posted in Update

Inside the Centerhouse #1

November 9th, 2009

Check out these pictures of the inside of the Centerhouse. The crew has installed the kitchen hood and all the interior walls have been framed.

Tags: , , , ,
Posted in Update

Progress Update #17

October 29th, 2009

With the roof now installed, the crew has been busy the last few weeks framing the interior walls of the building. The numerous subcontractors on the project have also recently started installing the electrical system, the sprinkler system, metal on the roof and the heating and cooling ductwork.

Tags: , , , ,
Posted in Update

Progress Update #16

October 23rd, 2009

In case you missed any of the last 5 months, here is what has happened on the Centerhouse project. This video shows selections of time lapses to show the progress so far.

Tags: , , , ,
Posted in Update