Posts Tagged ‘building’

Progress Update #20

Thursday, January 7th, 2010

Check out this latest video of the progress on the Centerhouse. The crew is finishing the drywall, working on the decking and painting the downstairs.

Tags: , , ,
Posted in Update

Inside the Centerhouse #2

Monday, November 30th, 2009

The crew has started insulating the walls as well as preparing the outside of the building for stucco. Check out the gas fireplace installed as well as some view inside the walls of the Centerhouse.

Tags: , , ,
Posted in Update

Inside the Centerhouse #1

Monday, November 9th, 2009

Check out these pictures of the inside of the Centerhouse. The crew has installed the kitchen hood and all the interior walls have been framed.

Tags: , , , ,
Posted in Update

Progress Update #17

Thursday, October 29th, 2009

With the roof now installed, the crew has been busy the last few weeks framing the interior walls of the building. The numerous subcontractors on the project have also recently started installing the electrical system, the sprinkler system, metal on the roof and the heating and cooling ductwork.

Tags: , , , ,
Posted in Update

Progress Update #16

Friday, October 23rd, 2009

In case you missed any of the last 5 months, here is what has happened on the Centerhouse project. This video shows selections of time lapses to show the progress so far.

Tags: , , , ,
Posted in Update

Progress Update #15

Monday, October 5th, 2009

One of the most interesting updates so far. This video shows the installation of the SIP panels for the Centerhouse. This was recorded over the past week.

Tags: , , ,
Posted in Update

Progress Update #13

Saturday, September 26th, 2009

A short video showing the trusses installed on the Centerhouse. The crew will be start installing the SIP panels on Monday and should be done by the end of the week.

Tags: , ,
Posted in Update

Setting Trusses

Thursday, September 24th, 2009

There was lots of action on the construction site today. The morning was spent unloading and assembling the trusses for the roof. The afternoon brought the installation of 3 of the 6 trusses that are needed for the building. Check out the progress in the photo gallery below:


Lifting a Truss into Place

Tags: , , ,
Posted in Update

360 Virtual Centerhouse Tour #1

Monday, September 14th, 2009

Check out this 360 degree virtual tour of the Centerhouse. This picture was taken around the middle of the building. Click and hold your mouse to scroll left or right.

If it doesn’t show up, download Adobe Flash Player 10 here to view.

360 Virtual Tour

The Flash plugin is required to view this object.

Tags: , , ,
Posted in Update

Framing Update

Monday, September 14th, 2009

Check out these pictures of the framing progress on the Centerhouse. The crew has been working hard at the side walls as well as the front wall. This past week has brought the arrival of the SIP panels [which stands for Structural Insulated Panels] to the Fill Site. The 4′ x 20′ panels will make up the roof structure of the building. This upcoming week, the crew will be bringing in the exterior posts for the building. The arrival of these posts will start the deck construction. The posts will also provide support for the trusses which are scheduled to arrive Monday the 21st.

Photo Gallery

Tags: , , ,
Posted in Update