Posts Tagged ‘photo’
Centerhouse At Night
Wednesday, March 3rd, 2010
Check out some pictures of the Centerhouse all lit up at night. We also conducted a speaker test to see what the acoustic are like. The building is really coming together now, only a few more weeks and it should be all finished!
Tags: kitchen, photo, Update
Posted in Prayer
Installation Photos
Friday, February 5th, 2010
Photos of the concrete floor, kitchen and dish room equipment, cabinets and exterior paint.
Tags: concrete, kitchen, photo, Update
Posted in Update
Progress Update #21
Thursday, January 21st, 2010
Over the past weeks, the interior of the Centerhouse has been painted. Along with the new coat of paint, the 5 garage doors around the perimeter of the building are being installed. The kitchen is another area of activity. The crew has laid the tile in the kitchen and dish room as well as installed the new walk-in fridge and freezer. Check out the rest of the progress in this photo gallery below.
Around the exterior of the building, the crew has been pouring concrete slabs in front of doors as well as sidewalks. The concrete floor for the dining room portion of the building is scheduled to be poured this upcoming Friday. After that, the crew will start installing the kitchen equipment.
Tags: kitchen, paint, photo, Update
Posted in Update
Aerial Photo
Monday, December 28th, 2009
Riley Mullet, a Firwood Summer Staff alumni, snapped this shot as he flew over the Centerhouse. Thanks Riley for the great pic!
Tags: photo, Update
Posted in Update
Progress Update #19
Friday, December 4th, 2009
The kitchen, bathroom and storage room concrete floors were poured today. Also, the outside of the building is coming along with doors and siding going up.
Tags: concrete, kitchen, photo, Update, video
Posted in Update
Inside the Centerhouse #2
Monday, November 30th, 2009
The crew has started insulating the walls as well as preparing the outside of the building for stucco. Check out the gas fireplace installed as well as some view inside the walls of the Centerhouse.
Tags: building, kitchen, photo, Update
Posted in Update
Inside the Centerhouse #1
Monday, November 9th, 2009
Check out these pictures of the inside of the Centerhouse. The crew has installed the kitchen hood and all the interior walls have been framed.
Tags: building, framing, kitchen, photo, Update
Posted in Update
Setting Trusses
Thursday, September 24th, 2009
There was lots of action on the construction site today. The morning was spent unloading and assembling the trusses for the roof. The afternoon brought the installation of 3 of the 6 trusses that are needed for the building. Check out the progress in the photo gallery below:
Tags: building, framing, photo, Update
Posted in Update
360 Virtual Centerhouse Tour #1
Monday, September 14th, 2009
Check out this 360 degree virtual tour of the Centerhouse. This picture was taken around the middle of the building. Click and hold your mouse to scroll left or right.
If it doesn’t show up, download Adobe Flash Player 10 here to view.
360 Virtual Tour
The Flash plugin is required to view this object.
Tags: building, photo, Update, virtual tour
Posted in Update
Framing Update
Monday, September 14th, 2009
Check out these pictures of the framing progress on the Centerhouse. The crew has been working hard at the side walls as well as the front wall. This past week has brought the arrival of the SIP panels [which stands for Structural Insulated Panels] to the Fill Site. The 4′ x 20′ panels will make up the roof structure of the building. This upcoming week, the crew will be bringing in the exterior posts for the building. The arrival of these posts will start the deck construction. The posts will also provide support for the trusses which are scheduled to arrive Monday the 21st.
- Centerhouse Premiere
- Donate
- Project Purpose
- About the Centerhouse
- You May Be Wondering
- How to Give
- The Firs Mission Statement
- Contact Us
Archives
Categories
Links