Posts Tagged ‘photo’

Centerhouse At Night

Wednesday, March 3rd, 2010

Check out some pictures of the Centerhouse all lit up at night. We also conducted a speaker test to see what the acoustic are like. The building is really coming together now, only a few more weeks and it should be all finished!

Tags: , ,
Posted in Prayer

Installation Photos

Friday, February 5th, 2010

Photos of the concrete floor, kitchen and dish room equipment, cabinets and exterior paint.

Tags: , , ,
Posted in Update

Progress Update #21

Thursday, January 21st, 2010

Over the past weeks, the interior of the Centerhouse has been painted. Along with the new coat of paint, the 5 garage doors around the perimeter of the building are being installed. The kitchen is another area of activity. The crew has laid the tile in the kitchen and dish room as well as installed the new walk-in fridge and freezer. Check out the rest of the progress in this photo gallery below.

Around the exterior of the building, the crew has been pouring concrete slabs in front of doors as well as sidewalks. The concrete floor for the dining room portion of the building is scheduled to be poured this upcoming Friday. After that, the crew will start installing the kitchen equipment.

Tags: , , ,
Posted in Update

Aerial Photo

Monday, December 28th, 2009

Riley Mullet, a Firwood Summer Staff alumni, snapped this shot as he flew over the Centerhouse. Thanks Riley for the great pic!

Tags: ,
Posted in Update

Progress Update #19

Friday, December 4th, 2009

The kitchen, bathroom and storage room concrete floors were poured today. Also, the outside of the building is coming along with doors and siding going up.

Tags: , , , ,
Posted in Update

Inside the Centerhouse #2

Monday, November 30th, 2009

The crew has started insulating the walls as well as preparing the outside of the building for stucco. Check out the gas fireplace installed as well as some view inside the walls of the Centerhouse.

Tags: , , ,
Posted in Update

Inside the Centerhouse #1

Monday, November 9th, 2009

Check out these pictures of the inside of the Centerhouse. The crew has installed the kitchen hood and all the interior walls have been framed.

Tags: , , , ,
Posted in Update

Setting Trusses

Thursday, September 24th, 2009

There was lots of action on the construction site today. The morning was spent unloading and assembling the trusses for the roof. The afternoon brought the installation of 3 of the 6 trusses that are needed for the building. Check out the progress in the photo gallery below:


Lifting a Truss into Place

Tags: , , ,
Posted in Update

360 Virtual Centerhouse Tour #1

Monday, September 14th, 2009

Check out this 360 degree virtual tour of the Centerhouse. This picture was taken around the middle of the building. Click and hold your mouse to scroll left or right.

If it doesn’t show up, download Adobe Flash Player 10 here to view.

360 Virtual Tour

The Flash plugin is required to view this object.

Tags: , , ,
Posted in Update

Framing Update

Monday, September 14th, 2009

Check out these pictures of the framing progress on the Centerhouse. The crew has been working hard at the side walls as well as the front wall. This past week has brought the arrival of the SIP panels [which stands for Structural Insulated Panels] to the Fill Site. The 4′ x 20′ panels will make up the roof structure of the building. This upcoming week, the crew will be bringing in the exterior posts for the building. The arrival of these posts will start the deck construction. The posts will also provide support for the trusses which are scheduled to arrive Monday the 21st.

Photo Gallery

Tags: , , ,
Posted in Update