360 Virtual Centerhouse Tour #1

Monday, September 14th, 2009

Check out this 360 degree virtual tour of the Centerhouse. This picture was taken around the middle of the building. Click and hold your mouse to scroll left or right.

If it doesn’t show up, download Adobe Flash Player 10 here to view.

360 Virtual Tour

The Flash plugin is required to view this object.

Tags: , , ,
Posted in Update

Framing Update

Monday, September 14th, 2009

Check out these pictures of the framing progress on the Centerhouse. The crew has been working hard at the side walls as well as the front wall. This past week has brought the arrival of the SIP panels [which stands for Structural Insulated Panels] to the Fill Site. The 4′ x 20′ panels will make up the roof structure of the building. This upcoming week, the crew will be bringing in the exterior posts for the building. The arrival of these posts will start the deck construction. The posts will also provide support for the trusses which are scheduled to arrive Monday the 21st.

Photo Gallery

Tags: , , ,
Posted in Update

Progress Update #12

Wednesday, September 9th, 2009

A short video showing the progress of the past week or so. The crew has been working on building exterior walls and setting posts for the roof. Take a look here:

Photo Gallery – Progress Update #12

Exterior Walls Go Up

Exterior Walls Go Up

Tags: , , ,
Posted in Update

Progress Update #11

Tuesday, September 8th, 2009

This time lapse shows the process of setting the support beams through finishing the sub floor.

Tags: , , ,
Posted in Update

Progress Update #10

Thursday, August 20th, 2009

The crew has been hard at work setting beams and framing walls. On Wednesday, they will be bringing in a crane to set the rest of the beams for the floor. Doug Walker and crew have been working on nailing 425 joist hangers in preparation for the beams. The building is starting to take shape with the continued framing of the basement exterior walls.

This is the last week of camp for the summer at Firwood and will mark the last time that campers use the Longhouse for meals [Guest Groups in the fall will continue to use the facility]. Share a favorite memory of the Longhouse on Facebook.

Tags: , , ,
Posted in Prayer

Progress Update #9

Friday, August 14th, 2009

Check out this video of the progress today:

Tags: , , ,
Posted in Update

Progress Update #8

Thursday, August 13th, 2009

The crew has started the framing stage of the Centerhouse. They have started with one of the side walls in the basement as well as the glue-lams in the upper section. The support beams require nailing in lots of joist hangers which Doug Walker and his two assistants, Robb Watson and Landon Block, were helping to secure today. Check out the video and photo gallery below.

Video

Photo Gallery

Building Walls

Building Walls

Tags: , , , ,
Posted in Update

Setting Poles and Concrete Work

Monday, August 10th, 2009

Over the last week or so, the crew has been working on setting four poles that go from the basement to the roof. Last Friday, they finished pouring the concrete retaining wall that protects the parking area from the hillside. They have also started working on the filtration system that will go between the building and the Skate Ramps.

The crew setting support poles for the roof

The crew setting support poles for the roof

Tags: ,
Posted in Update

Progress Update #7

Tuesday, July 28th, 2009

Progress continues on the foundation for the Centerhouse. The walls have been poured along with the concrete slab in the basement. The crew, along side the help of some volunteers, is working on putting up a waterproof membrane and back filling the foundation. They are also working on digging out for the footing for the wall that will go behind the kitchen. Early August should bring the start of framing.

Progress Update #7 – Photo Gallery

Basement Slab and Foundation Walls

Basement Slab and Foundation Walls

Tags: , , , , ,
Posted in Update

Longhouse Time Lapse

Thursday, July 23rd, 2009

Here is a time lapse of a lunch from Middle School Camp #202 in the Longhouse, the current dining facility at Camp Firwood. The video starts at 12:15pm with setup and continues through until 1:30pm when everything is cleared and put away. During this meal, there are approximately 350 people that were feed inside the Longhouse.

Tags: ,
Posted in Update