360 Virtual Centerhouse Tour #1
Monday, September 14th, 2009
Check out this 360 degree virtual tour of the Centerhouse. This picture was taken around the middle of the building. Click and hold your mouse to scroll left or right.
If it doesn’t show up, download Adobe Flash Player 10 here to view.
360 Virtual Tour
The Flash plugin is required to view this object.
Tags: building, photo, Update, virtual tour
Posted in Update
Framing Update
Monday, September 14th, 2009
Check out these pictures of the framing progress on the Centerhouse. The crew has been working hard at the side walls as well as the front wall. This past week has brought the arrival of the SIP panels [which stands for Structural Insulated Panels] to the Fill Site. The 4′ x 20′ panels will make up the roof structure of the building. This upcoming week, the crew will be bringing in the exterior posts for the building. The arrival of these posts will start the deck construction. The posts will also provide support for the trusses which are scheduled to arrive Monday the 21st.
Tags: building, framing, photo, Update
Posted in Update
Progress Update #12
Wednesday, September 9th, 2009
A short video showing the progress of the past week or so. The crew has been working on building exterior walls and setting posts for the roof. Take a look here:
Photo Gallery – Progress Update #12
Tags: building, framing, Update, video
Posted in Update
Progress Update #11
Tuesday, September 8th, 2009
This time lapse shows the process of setting the support beams through finishing the sub floor.
Tags: building, framing, Update, video
Posted in Update
Progress Update #10
Thursday, August 20th, 2009
The crew has been hard at work setting beams and framing walls. On Wednesday, they will be bringing in a crane to set the rest of the beams for the floor. Doug Walker and crew have been working on nailing 425 joist hangers in preparation for the beams. The building is starting to take shape with the continued framing of the basement exterior walls.
This is the last week of camp for the summer at Firwood and will mark the last time that campers use the Longhouse for meals [Guest Groups in the fall will continue to use the facility]. Share a favorite memory of the Longhouse on Facebook.
Tags: building, framing, Update, video
Posted in Prayer
Progress Update #9
Friday, August 14th, 2009
Check out this video of the progress today:
Tags: building, framing, Update, video
Posted in Update
Progress Update #8
Thursday, August 13th, 2009
The crew has started the framing stage of the Centerhouse. They have started with one of the side walls in the basement as well as the glue-lams in the upper section. The support beams require nailing in lots of joist hangers which Doug Walker and his two assistants, Robb Watson and Landon Block, were helping to secure today. Check out the video and photo gallery below.
Video
Photo Gallery
Tags: building, framing, photo, Update, video
Posted in Update
Setting Poles and Concrete Work
Monday, August 10th, 2009
Over the last week or so, the crew has been working on setting four poles that go from the basement to the roof. Last Friday, they finished pouring the concrete retaining wall that protects the parking area from the hillside. They have also started working on the filtration system that will go between the building and the Skate Ramps.
Tags: concrete, Update
Posted in Update
Progress Update #7
Tuesday, July 28th, 2009
Progress continues on the foundation for the Centerhouse. The walls have been poured along with the concrete slab in the basement. The crew, along side the help of some volunteers, is working on putting up a waterproof membrane and back filling the foundation. They are also working on digging out for the footing for the wall that will go behind the kitchen. Early August should bring the start of framing.
Progress Update #7 – Photo Gallery
Tags: concreate, digging, photo, Update, video, volunteer
Posted in Update
Longhouse Time Lapse
Thursday, July 23rd, 2009
Here is a time lapse of a lunch from Middle School Camp #202 in the Longhouse, the current dining facility at Camp Firwood. The video starts at 12:15pm with setup and continues through until 1:30pm when everything is cleared and put away. During this meal, there are approximately 350 people that were feed inside the Longhouse.
- Centerhouse Premiere
- Donate
- Project Purpose
- About the Centerhouse
- You May Be Wondering
- How to Give
- The Firs Mission Statement
- Contact Us
Archives
Categories
Links